AMERICAN DENTAL ASSOCIATION

Rajeev Nedumaran • Oct 02, 2022

American Dental Association improves ventilation, meets code compliance with Aeroseal.

For the past decade, Mike Kosinski and his team of experts at CEPro Inc. have been caring for the historic ADA building on Chicago’s Near North Side. Built in 1965, the 23-story skyscraper has undergone numerous upgrades and renovations, but none as transformative as those planned for the building’s fourth-floor medical laboratory. Leaks in risers connecting the labs’ fume hoods to two rooftop fans were making adequate ventilation impossible. Unable to meet stringent exhaust code specification, some of the fume hoods were rendered inoperable. Without a solution to the problem, laboratory renovation was impractical. Talks of having to relocate the entire facility had even begun to take place.


Each of the building risers were encased in individual concrete structures that drape over the building’s exterior. This meant accessing the enclosed ductwork to seal the leaks would require nothing less than major building demolition. As a result, the leaks continued to plague the facility.



That’s when CEPro’s Mike Wessel, learned about Aeroseal’s ability to seal ductwork from the inside. After initial research and meetings with building management, Wessel got the go-ahead for a preliminary duct sealing project. Airways Systems’ Joe St. Pierre got the call to handle the leaky shafts. When finished, the print out report generated by the Aeroseal system showed the results – Aeroseal reduced leakage by as much as 94.5%. A week later, Joe got the go ahead to seal the rest of the leaky shafts. In the end, Joe and his team reduced leakage by more than 2,000 CFM, more than enough to meet code and get all fume hoods up and operational. Renovation of the ADA lab is back on the schedule and moving forward.


PROJECT OVERVIEW



BUILDING

American Dental Association Building


LOCATION

Chicago, Illinois


AEROSEAL CONTRACTORS

Airways Systems Inc.


GOAL

Meet code for proper lab fume hood operations


BEFORE AEROSEAL

2,733 CFM of leakage


AFTER AEROSEAL

606 CFM of leakage


RESULTS

Aeroseal eliminated 2,127 CFM of leakage. With proper exhaust now possible, all fume hoods are back up and operational. Renovation on schedule.


There was simply no other practical solution. If not for Aeroseal, we would be moving the lab right now, incurring millions of dollars to change strategy and writing off millions in investment that had already been made in the building. Aeroseal extended the life of their investment – I can’t even estimate the total cost savings this represents.

- Michael Wessel Project Engineer CEPro Inc.

To Learn More About Improving The Comfort, Indoor Air Quality, and Energy Efficiency Of Your Building Call 0226759426 or Email info@aeroseal.nz

24 Aug, 2023
Leading the charge in energy conservation and indoor air quality improvement, Weis Markets, a prominent Mid-Atlantic supermarket retailer, is making strategic strides. The retailer has embraced cutting-edge technology by adopting the Aeroseal duct sealing solution.
Achieving Optimal Indoor Air Quality: A Medical Facility Case Study
23 Jul, 2023
Learn how Aeroseal helped Seal ductwork to 97% leakage reduction; Save $22,694 in annual energy usage/cost at a New York Medical Facility.
Duct Sealing: Boosting Energy Efficiency and Reducing Costs.
04 Jul, 2023
Are your energy bills skyrocketing? Are you constantly adjusting the thermostat, yet still feeling uncomfortable in your own home? If so, you may be overlooking a critical area of energy loss in your house - your ductwork. Read on to find out how you can reduce your costs and increase effeciency by sealing your ducts.
More Posts
Share by: